Thanks BJ for the confidence. Adam, thanks again for the suggestion, I like the way it's coming along. Tom, have you had any troubles with room temperatures too low in the winter and no heat? The rubber mats will be in this week.
We got a little done last night, the walls are up if you call the studs, seals and plates walls anyway. A before and after of the same spot. Later today, after work, we will get the anchor bolts drilled/installed, insulation and exterior portions on. Then on to the ceiling and roof. Then.....
Anyway, before with the print bandit and an after. We all had a good time doing this, none of us had a clue. Myself, my wife and son's that is.
So, I was out there looking at the supplies and making plans before the work day and noticed my son picked up just on 5/8" plywood for the siding. We'll be taking that back for the 3/4 as the inset for the wall studs to the R-panel ledge is setup for 1-1/2" space plus the foam inside R-panel seal to slab. Oh well, still got some supplies to purchase anyway, I'll just send him with a longer list. hehe